The roof warranty excluded hail. The Air Force rejected the bid.
GAO upheld the rejection of a low bid whose draft warranty did not demonstrate the storm protection the solicitation required.
What happened
The Air Force sought roof repairs at F.E. Warren after August 2025 storm damage. Its April 2026 solicitation required a draft manufacturer warranty showing 20 years of coverage, no dollar limit, winds up to 120 mph and hail up to three inches.
Prestique's draft left the duration and wind threshold blank and excluded hail. Prestique argued its accompanying manufacturer letter and overall promise of compliance were enough. In its October 19 decision, GAO found the letter conditional and upheld the rejection.
Why CMCoE cares
The lowest price cannot cure a required warranty that fails to demonstrate the specified protection.
Regulatory fine print
This was a rejected bid, not a warranty the Air Force bought. Prestique's $5,159,546 and Miwok's $5,958,875 were evaluated totals including options, not a finding of wasted money. The decision calls the original damage storm damage. Keeping a roof indoors is satire, not an actual contract term.